Classification | Types and ratings of trip relays | |||||
---|---|---|---|---|---|---|
TYPE | 60Hz | N*6 | C*6 | P*6 | M*6 | |
50Hz | N*5 | C*5 | P*5 | M*5 | ||
Application | For industry | For industry | For generator protection | For generator protection | ||
Possible number of ACB poles | 3,4P | 3,4P | 3,4P | 3,4P | ||
Operating voltage | 1 | AC/DC 110V-220V | AC/DC 110V-220V | AC/DC 110V-220V | AC/DC 110V-220V | |
2 | DC24V | DC24V | DC24V | DC24V | ||
4 | DC48V | DC48V | DC48V | DC48V | ||
Communication | — | ● | — | ● | ||
Communication protocol | — | RS 485 | — | RS 485 | ||
Protocol | — | DNP 3.0 | — | DNP 3.0 | ||
Transmission speed | — | 9600 bps | — | 9600 bps | ||
Operating characteristics | Long-time delay (L) | ● | ● | ● | ● | |
Short-time delay (S) | ● | ● | ● | ● | ||
Instantaneous time delay (I) | ● | ● | ● | ● | ||
Ground fault (G) | ● | ● | ● | ● | ||
Pre-alarm (P) | ● | ● | ● | ● | ||
Rated current (A) | In =…×In Max. | For industry : 0.2-0.3-0.4-0.5-0.6-0.7-0.8-0.9-1.0 For generator protection : 0.2-0.3-0.4-0.5-0.6-0.7-0.8-0.9-1.0 |
||||
Continuous current (A) | Ic =…×In | 0.6-0.65-0.7-0.75-0.8-0.85-0.9-0.95-1.0 | ||||
Long-time delay (L) (Error tolerance : ±10%) |
Trip current (A) | IL=…×Ic | 1.5 | |||
Trip time (sec) | LTD | For industry : 15-20-25-30~465-470-475-480(Steps:5sec) For generator protection : 1.5-2.0-2.5-3.0~46.5-47.0-47.5-48.0(Steps:0.5sec) |
||||
Short-time delay (S) (Error tolerance : ±15%) |
Trip current (A) | Is =…×In | 1.5-2-3-4-5-6-7-8-9-10-no(Steps : 0.5) | |||
Trip time (sec) | STD | 0.05-0.06~0.49-0.5(Steps : 0.01sec) | ||||
Instantaneous time delay (I) (Error tolerance : ±15%) |
Trip current (A) | Ii =…×In | 4000A under : 2-3-4-5-6-7-8-9-10-11-12-13-14-15-16-no(Steps : 1) 5000A over : 2-3-4-5-6-7-8-9-10-11-12-no(Steps : 1) |
|||
Trip time (sec) | INST | 0.025 under (Note) | ||||
Ground fault (G) (Error tolerance : ±20%) Pre-alarm (P) (Error tolerance : ±10%) |
Trip current (A) | Ig =…×In max Inp =…×In max |
3 pole : 0.2-0.3-0.4-0.5-0.6-0.7-0.8-0.9-1.0-no(Steps : 0.1) 4 pole : 0.5-0.6-0.7-0.8-0.9-1.0-no(Steps : 0.1) |
|||
Trip time (sec) Trip current (A) |
GTD | 0.1-0.2-0.3~2.8-2.9-3.0 (Step : 0.1sec) | ||||
Ip =…×Ic | 0.7-0.8-0.9-1.0 | |||||
Trip time (sec) | PAL =…×LTD | 0.5(setting Ip 1.0), Operating time : Half of the long time invers time |
Note
Operational voltage | OCR - III |
---|---|
AC/DC 110-220V | 5VA |
DC 24V | 5VA |
DC 48V | 5VA |
Function | |
---|---|
N | Communication function NO (For industry) |
C | Communication function YES (For industry) |
P | Communication function NO (For generator protection) |
M | Communication function YES (For generator protection) |
Operational voltage | |
---|---|
1 | AC/DC 110-220V |
2 | DC 24V |
4 | DC 48V |
Frequency | |
---|---|
6 | 60Hz |
5 | 50Hz |